Wednesday, 23 November 2011

Batts in the Belfry

 As we insulate our house with a certain pink kiwi icon, it seems an apt time to re-examine our ‘mission statement’.
Mich, our Plumber, steps into the 'pink palace'
 The project management triangle is often raised when planning an endeavour, or excusing a result which doesn’t meet with universal satisfaction.  The three points of this triangle are cost, schedule and scope and they constantly maintain pressure against one another throughout any project.
In building our home, this model naturally applies, but could also be interpreted as cost, schedule and environmental responsibility.  Our commitment to sustainable living has tugged constantly against our timeframe and particularly our budget, threatening to turn our triangle into a point of singularity and become our own time and matter-engulfing black hole. 
Rose and Ed examine the Gib board waiting to become our interior walls
 Another pressure is the well-intended expectations of others, whose encouragement has been more sustaining to us than they realise, but whose sense of scope isn’t constrained by the practical factors which our vision must meet.  For example: so that we stand a chance of moving into a mostly-completed house by Christmas (THIS year), without financially crippling ourselves, we’ve chosen to insulate our home with fibreglass Batts.
Other, more exotic and arguably more environmentally-friendly options exist (including natural wool) but Batts isn’t the pink peril it’s sometimes claimed to be, either.
Firstly, it’s made from up to 80% recycled glass, utilising huge quantities of a waste product to actually benefit sustainable living. Batts has earned an accreditation from Environmental Choice New Zealand which assesses every aspect of the manufacturing process and end product in relation to our environment.  But most importantly, it has a proven track record since 1961, guaranteed to keep our home warm and dry by preventing airflow through interior and exterior walls, therefore conserving our preciously earned energy for the next 50 years.

Dean cuts and places the gib board (seen here in our study),
ready for us to ‘glue and screw’
 The next few weeks are going to be a flurry of activity, with electricians, our builder, plumber and waste system installer all scrambling over one another to fit out our almost completed home with the services it needs.  By the time we move out of our container and into our new house this adventure will have lasted almost exactly nine months – a full gestation period!

While all this has gone on I’ve been responsible for hammering
in 20kg of nails to keep our new floor in place.

Sunday, 13 November 2011

Down to the Wires

Our floor is now covered in matai boards, and the walls sprout electrical cables like multi-coloured jungle vines. This is apparently called ‘first fix’.

We no longer have to pick our way carefully across the exposed floor joists, risking life,
limb and under floor pipes. Now we could waltz across this flawless floor if we wanted to.

The spring weather continues to be somewhat indifferent, but with the focus now on the inside of the house this hasn’t affected progress at all.
Dean somehow managed to lay our floorboards in record time, so now it just remains for me to nail them all down. It will be a long, tedious and uncomfortable process – time to reach for the iPod...

Our under-floor black polythene sea begins to disappear as the ‘Planks from Palmy’
start to line up.
Meanwhile the housing for our solar tubes is mounted on the roof. We altered the angle
and position slightly (from 40 to 35 degrees) so it won’t interfere with our roof line too much.
The wiring is installed in the areas we indicated with our ‘symbols of power’
a couple of weeks ago.  Don't ask me what goes where...
As the weather warms up Rose discovers that the ‘solar heated shower’
she bought at the beginning of the year does actually work.
(Basically a big rubber bladder with a nozzle attached, it gets filled with water,
left out in the sun all day and is apparently very refreshing.)

Friday, 4 November 2011

Floor wheel drive

The travelling floor show hits town as we bring floor boards from another province all the way back to their new home.

The trailer looked perfectly capable of carrying our floor, but the little
Suzuki vitara inspired less confidence.
 As Dean fast approached the point where he’s ready to begin laying our floor boards, we realised we’d better make actually getting them on site our priority.
Back in August, we ordered some recycled matai floor boards from a disused factory in Palmerston North, and also decided that we would collect them ourselves. In the meantime, a little apprehension had begun to creep in regarding whether we’d actually be able to achieve this – having no idea what kind of load we’d actually be expected to carry until we saw it for ourselves.  The possibility only being able to bring some of it home ourselves, and then having to pay to freight the rest was just too galling to contemplate.

Borrowing our neighbour’s tandem trailer, we set off for Palmerston North, and returned to the factory which our timber originally adorned.  The poor building was in even more of a derelict state now, the roof thieves having turned their attention to the guttering down pipes, which had caused even more interior water damage.  Fortunately our boards were fine and we had the help of Jason and one of his workers to help us load up.  Jason approved of the trailer, which manfully soldiered the considerable load of timber, but had misgivings about our little Suzuki Vitara’s ability to pull it all the way home.  Commonly known as Barry (he’s white, get it?) this humble vehicle has been the best car we’ve ever owned , triumphing over everything we’ve thrown at him, so we still clung to some hope.

Enduring some mild ridicule over the washing line rope and bungee cords we had expected to tie our load down with, we purchased a ratchet cord, grabbed some lunch, and then made an assault on the hill leading back to the Wairarapa.  
Crawling up the steep incline while trying not to let traffic build up behind us, we nervously watched the temperature gauge all the way.  But once we reached the summit, things got easier and once again, Barry came through.  It was a very slow trip home, with our rapidly emptying petrol gauge becoming the one to watch but our mighty load didn’t budge a millimetre - must have been the washing line rope.

Rose relaxes in the sun after the floor boards are safely stacked in our bedroom
 After the floor was unloaded another important job beckoned before the boards could be laid.  I’ve mentioned our high water table often, and this can result in a house’s underfloor becoming very damp as the moisture as drawn upwards by the warmth of the rooms above.  Some cases have even reported constant dripping water as if a pipe has burst.  A solution is to cover the ground under the house with heavy black polythene, which acts as a very effective moisture barrier.  Obviously the time to do this was while we still have easy access beneath the floor, so I donned my boiler suit and once again became the ‘under-floor monkey’. As I slithered about in the cramped semi-darkness I recalled a news report I’d heard about emergency services in Turkey using particularly thin people to locate and rescue survivors buried in earthquake rubble.  Perhaps I’ve missed my calling…
Within a couple of days, a smooth sea of black plastic covered every centimetre of our under-floor space, painstakingly cut and fitted around piles. And as of next week – we’ll be floored!

The ‘under-floor monkey’ begs to be let out into the light

Friday, 28 October 2011

Symbols of Power



It’s difficult to get our heads around, but the outside of the house is all but complete!
As our attention now turns inward, we found ourselves back in more familiar territory.



Putting up Gib board, choosing paint colours, deciding positions for taps, drains, power sockets, switches, even putting down sections of floor – we’ve been here many times before. As with all our previous homes, the scale of the endeavour has once more increased – but then so has our own level of experience.
While we continue to wrestle with a look for our new bathroom – the one room whose wall and floor coverings generally aren’t painted or carpeted afterwards; requiring a colour scheme decision straight away – the electrician needs our attention first.

Lights (pendant, wall mounted and the down-light variety), switches (single and double) and power sockets of every configuration need to be quantified, argued about, indicated, moved and possibly regretted afterwards. A fuse box needs to be housed, cables have to be run, extractor fans installed and monitoring units for our off-grid energy production positioned. I haven’t even mentioned phone jacks, coaxial cable sockets or the special requirements of our photovoltaic panels and batteries.
When we drew our own wildly inaccurate floor plan at the beginning of the year, we also supplied a ‘lighting plan’; peppering our home with various exotic symbols indicating placement of the myriad of electrical points mentioned above. This seemed to serve the purpose of making an initial quote possible, but as an unbelievably quick seven month mark in our container loomed, we suddenly found ourselves with a couple of days before the electrician arrived for his pre- wiring meeting.

We had to be ready, but fortunately, he had recommended that we literally marked positions inside our house with bits of note paper. Having already created our own hieroglyphs at the beginning of the year, we could go one better than that, so the day before the meeting saw Rose and I placing carefully printed and cut-out symbols on our house’s interior framework with double-sided tape. This took much longer than expected, because we both became acutely aware of how important each of these little sticky-backed decisions were. The process began to take on a surreal Marcel Marceau quality, as we took turns carefully miming the putting in of plugs and switching on of lights, along with the opening and closing of non-existing doors before leaving our mark. When this house is finished, we really will need to see about getting out more!

Absurd and pedantic as it all was, our care paid off the next day when the meeting took a mere hour and a half. Our electrician told us horror stories of five and a half hour endurance tests with indecisive or bickering couples, some partners even storming off and leaving him with no choice but to return for round two later. In our case, however, a few adjustments were suggested for logistical reasons and a date was set.
As of next week, we’ll be wired, socketed and switched – and the next challenge will be for us to actually generate enough power to be able to use them.

At the end of a series of long discussions, here I am - doing as I'm told.

Friday, 21 October 2011

Glazing into Space

We now have the most wonderful doors and windows in place, and the house looks just as it's supposed to! Rose got the day off to help so talks us through it...
Five of us were on hand on Friday afternoon to install all the components, some of which, like the six panel sliding doors for the living room would be quite heavy!

Mind those bumps in the driveway!

The whole lot arrived on the trailer at 12.30 - earlier than expected as rain threatened, and Fairview (the manufaturers) didn't want the new Cedar front door to get wet.

The front door is lifted into place - safe and dry.

Carl (from Fairview) drove around the house so we could deposit the right components in the right places. The process was very smooth, the lifters would get the item off the trailer and in position below the correct space, Dean and Carl lifted the frames into position, we'd all hold it upright and in the gap and Dean drilled and nailed the window frame into the framing of the house. 

The kitchen window is lifted into position




Dean nails our bedroom doors in place

The living room doors were reduced to just the end panels and lifting it into position last was a fairly easy task before putting the panels back into place and ensuring it all behaved as it should.

The clerestories were slightly more complicated and required Dean and Jacob on the roof and the rest of the team inside precariously balanced on floor joists handing the frames up to them. Tricky, heavy but we managed.

The installation of the clerestory windows required some Kiwi ingenuity.

It only took us a couple of hours to complete the job and the sun shone the whole time.  
When Al arrived home with the usual Friday night fish and chips - I had set up an outdoor table in our bedroom,  with candles and a bottle of champagne to celebrate our joinery.  Another important phase of our build seems to have gone without a hitch.

Completely weather-tight at last!




Saturday, 15 October 2011

Boarding Time

Despite a great start it’s been a mainly damp spring, so far. A good time then, for our house to finally get dressed.


Nice lines! This detail makes the house look as if it was designed
by someone who knew what they were doing, rather than us.

At the earliest stages of planning our home, we fearlessly proclaimed that it would be clad in locally-grown macrocarpa, and be allowed to silver over time to resemble the nearby barns which we took our inspiration from. We liked the idea of using locally sourced and sustainable timber rather than an air-mile eating imported variety.


Rose unveils our recently delivered Cedar – it smells nice, too.
Sometimes the best laid plans can be defeated by practicality, and this was the case here. Macrocarpa has a tendency to warp, meaning that we would be constrained to using heart wood only. Even so, the potential for the timber to alter its shape clearly made our builder Dean, a little uneasy. He takes his responsibilities very seriously - his priority being ensuring that nothing is going to go wrong with this build in the future. Neither party ever wants him to have to come back to fix something.
The final nail in the macrocarpa coffin was the discovery that Dean was unable to source it in the lengths he needed – which would mean far more joins along the exterior walls, further compromising their weather-tightness.
Reluctantly we elected go with the only other option – imported Western Red Cedar.
To quote the product description: it is sustainably sourced from the natural forests of coastal British Columbia, it is noted for it’s stability, durability and fragrance – and has proved itself in New Zealand conditions since early last century.
With those credentials, and the increasingly impracticality of our first choice, we felt better about going with an imported timber.

Our first board - and a plank.

To keep ahead of the weather, Dean completes the most-exposed west side first.
  
He then moves to the long north side, which involves a huge amount of
patient measuring and cutting because of our numerous windows and doors.

After the ensuing week of rain the weather begins to lift, and the sun shines on
the completed east side. The south side is still awaiting its Titan Panel cladding.
The cladding for the south side of the house was always going to be something quite different. Rose explains:

"Sensible eco design calls for minimal options for cold air to enter a house on the southern side (in this hemisphere, at least). The south-facing wall of our new home has just one long thin window, three skylights and the front door in it for just this reason.
While researching front door options I came across an image of a beautiful cedar door in a long expanse of grey zinc cladding and fell in love with the clean lines and contrasting look. Costing the zinc was a $20K reality check - so we clearly needed to find an alternative.
One of my favourite New Zealand architects is Parsonson Architects, who use a James Hardie fibre-cement product called Titan panel in their designs. The large, smooth surfaces with sharp negative detail between them create a very similar aspect to the zinc, so we thought that this might be a viable alternative."

'Class of the Titan' - and here it is; presenting an 'impassive' face to the world
It’s mainly a commercial property product, and our decision to use it still raises some eyebrows. But now that we can see it in position, it’s yet another component of this build which has utterly exceeded our expectations – we’re thrilled with it.
Presenting such an initially impassive and practical face to visitors perhaps says more about us than we would like, but the twin requirements of acting as an effective shield against the southerly chill and having minimal visual impact on our surroundings have been well met. We’re glad to be clad!


Juno dreams about living in a house again.

Saturday, 8 October 2011

Another Crate Read

Our second newspaper article appeared in the Dominion Post Your Weekend magazine, Yesterday.

Rose caught in a domestic chore moment - probably collecting water to
help clean the liquid mud off me. (all images courtesy of The Dominion Post)
Due to the vagaries of page counts and advertising space, being a double page spread meant that the article has waited two months for space to become available – but better late than never.
The photographs illustrating the piece were taken at the beginning of August, and show the house in a far less advanced state of completion than it is now, but Loren the photographer’s main brief was to depict life inside our container.
One of the biggest problems was getting enough brightness into our living space, so we turned on the generator for the lights and opened both doors, giving just enough illumination for Loren to work with.  Spotting Ed, (the only one of our cats unfazed by visitors), he was immediately contracted for a number of shots.  It seems to be one of those unwritten laws that cats must appear in interior living shots – and Ed displayed a hitherto unsuspected penchant for modelling; working the lens like a professional.
The best of Loren’s photographs can be seen in the article, but I’ve included a few others, including this exclusive behind-the-scenes catwalk shot.

Loren snaps Ed as he works the runway
Although the weather was a vast improvement on the first Dominion Post photoshoot, back in July, not everything went smoothly. While moving Loren’s car so that our builder get past, I managed to get bogged down in mud, which then sprayed me from head to foot when I helped push the vehicle out again. ( I am so cool).

The Your Weekend Editor mentioned last week that apparently Rose and I could have made the cover (we still get a mention) if her Plan A hadn’t worked.  Maybe next time – and I bet Ed will get into the shot.

Can my human be in this one?
Postscript: A very special thanks to Marie for her lovely and encouraging card.